A356-T6 Heat Treatment: Process and Acceptance Guide

T6 is a specified delivered condition, not a general instruction to heat treat every aluminum casting. Whether a part requires it depends on the selected alloy, drawing, service requirements and approved manufacturing route. A supplier should confirm those inputs before proposing a heat-treatment process.

On this page
  1. Three Steps in the Process Description
  2. Start With the Drawing and Material Requirement
  3. In-house T5/T6 at Bohua
  4. T5, T6, and T7 Are Different Approval Decisions
  5. Test Bars Are Not the Same as Casting-Wall Evidence
  6. Plan Dimensional Control and Machining Sequence
  7. Records to Scope in the RFQ
  8. FAQ

Three Steps in the Process Description

For a casting specified for a suitable T6 route, a practical process description separates solution treatment, quenching and artificial aging. These steps explain the sequence; they do not supply an operating recipe.

Three stages to define in the approved T6 route
StepPurpose of the reviewInformation the approved process must define
Solution treatmentEstablish the required material condition before quenchingApplicable alloy/specification, qualified temperature and time, load arrangement and furnace control
QuenchingControl the cooling stage and its effect on the partTransfer requirements, medium and controlled conditions, loading and distortion considerations
Artificial agingDevelop the specified aged conditionQualified temperature/time, process sequence and acceptance evidence

Do not use a generic temperature range from an article as a furnace setting. The responsible heat-treatment engineer must establish the qualified parameters for the governing specification, alloy, section and equipment. Furnace temperature and time follow the approved process sheet for the alloy, section and equipment. This page does not give those settings.

Start With the Drawing and Material Requirement

The purchase package should identify the alloy, temper, governing specification and edition. State whether mechanical requirements apply to a separately cast specimen, a representative coupon or material taken from the component. Also define the condition in which dimensions, hardness and functional features will be inspected.

Structural duty, sealing duty or a particular strength target does not by itself prove that T6 is mandatory. The designer must approve the material and process route that satisfies the complete requirements. An as-cast route or another approved temper may serve a different design; those alternatives require their own evidence.

For alloy-specific information, see A356 aluminum for gravity casting.

In-house T5/T6 at Bohua

At Bohua

Bohua carries out T5 and T6 heat treatment in-house. A356 and ZL114 are used for gravity and tilt-pour casting.

Casting, heat treatment, CNC machining and inspection share a site of about 16,300 m². Bohua has a WDW-100E tensile testing machine and Brinell hardness testing equipment.

At Bohua

Bohua's hardness equipment includes the HBE-3000A and a digital Brinell hardness tester.

For T6 acceptance, state the test location, required method and hardness limits in the purchase specification.

Tall blue cylindrical heat-treatment furnace on a steel frame above a yellow quench tank, round basket in front
In-house T5/T6 heat treatment

Use the furnace photograph to review our in-house heat-treatment equipment. Specify the required treatment cycle and batch acceptance records in your purchase package. Review the Bohua gravity casting process and equipment alongside the required delivered condition.

T5, T6, and T7 Are Different Approval Decisions

Treat each specified temper as a separate delivered condition. Do not accept a quote that lists several tempers without identifying which one controls the order. A proposed alternative should explain its compatibility with the selected alloy, manufacturing route and required properties, and should enter the customer's change-control process.

If a supplier recommends a different condition to manage distortion, dimensional stability or another requirement, ask which evidence supports that recommendation. Changing the temper can also change the machining sequence and validation plan. A general claim that a temper is better is not enough to approve it.

Test Bars Are Not the Same as Casting-Wall Evidence

A test report is useful only when its relationship to the supplied parts is clear. Ask for the lot or heat-treatment batch, specimen origin, location when relevant, preparation, test method, results and acceptance criteria. A passing separately cast bar should not be described as proof that every location in every casting has the same properties.

Hardness, tensile testing, dimensional inspection and functional tests answer different questions. Agree the required combination and sampling with the customer. Do not create a universal test frequency from the weight of metal processed, and do not convert one test result into another property without an approved basis.

For heat-treated castings under ASTM B108/B108M-25, separately cast specimens are heat treated with the castings they represent. Specimens taken from castings are prepared after heat treatment. Keep the SI and inch-pound requirements independent when reading the specification.

Source: ASTM B108/B108M-25 specimen and heat-treatment scope. This relationship establishes the test basis; it does not supply Bohua batch results.

Specimen evidence to agree before production; no measured results are presented
Evidence fieldSeparately cast test barSpecimen taken from the casting
Material and delivery stateIdentify alloy, temper and the treatment representedIdentify alloy, temper and component condition at sampling
Specimen origin and locationRecord bar origin and preparationMark the extraction location, orientation and preparation
Batch relationshipConnect the bar to the represented casting and heat-treatment batchesConnect the sampled component to its casting and heat-treatment batches
Test method and standard editionRecord the governing method, edition and acceptance limitsRecord the governing method, edition and acceptance limits
Sample countAgree and record the number of specimens and represented partsAgree and record the number of specimens and sampled components
InterpretationA result applies to the identified specimen and agreed acceptance basisA result applies to the sampled location and agreed acceptance basis
Floor-standing universal testing machine with a test bar clamped between grips in a bright lab
Tensile testing machine for mechanical properties

Use the quality control and inspection overview to review available equipment. Request the batch records needed to check your specified treatment and acceptance requirements.

Plan Dimensional Control and Machining Sequence

Discuss the sequence of casting, trimming, heat treatment, straightening if permitted, rough machining and finish machining. Identify datums and features whose condition must be checked after the relevant processing stage. Include handling and support requirements where they affect distortion or damage.

Confirm how nonconforming results will be handled. Re-treatment, straightening, welding or other repair should follow the applicable specification and customer approval; a supplier must not assume a second treatment is automatically permitted. Traceability should allow the affected batch and subsequent operations to be identified.

For feature-by-feature delivery requirements, use the casting and machining tolerance guide.

At Bohua

Bohua's routine casting tolerance is CT8 before the separate machining requirement is considered. Critical machined features can be specified to ±0.02 mm at Bohua.

Assign each dimensional check to a manufacturing stage
Feature groupCapability statement to reviewStage to state on the drawing
As-cast geometryRoutine CT8; review individual critical featuresIdentify whether the dimension is accepted before or after heat treatment
Finish-machined interfacesCritical machined dimensions to ±0.02 mmIdentify the final machining and inspection stage relative to T6
Distortion-sensitive geometryNo generic factory distortion value suppliedDefine datums, support condition and any permitted correction

Records to Scope in the RFQ

Agree the required records and acceptance basis before production.

  • Drawing revision, alloy, required temper and governing standard edition.
  • Approved process route and the party responsible for heat treatment.
  • Batch identification connecting castings to the required treatment records.
  • Furnace/process records and calibration or qualification evidence required by the contract.
  • Specimen origin, test method, sampling, acceptance limits and report format.
  • Dimensional inspection stage and functional test requirements.
  • Rules for deviations, repeat treatment, repair and customer notification.

These are quotation and approval inputs, not a claim that every project receives every record. Agree the required package before production so the supplier can price the work and plan traceability.

At Bohua

Bohua also has a JB-300B impact testing machine and fatigue testing capability.

If those tests are required for a heat-treated part, specify the method, specimen, loading conditions and acceptance criteria. Equipment availability alone does not define a T6 qualification result.

For a suspension bracket, include the required temper and specimen basis in the suspension bracket quotation scope.

FAQ

The drawing and approved specification control the delivered condition and acceptance tests.

Does every A356 casting require T6?

No. The drawing and approved material/process specification determine the delivered condition. Do not infer T6 solely from the part name or application category.

Can a hardness result replace all other acceptance tests?

Not automatically. The customer must define the evidence required for the part and the relationship between each test and its acceptance requirement.

What if a casting shows porosity or distortion after treatment?

Identify the affected batch, compare results with the approved requirements and follow the agreed nonconformance process. Review casting defects and verification methods without assuming a universal repair or rejection rule.

Send the drawing, material condition and required records through the heat-treatment RFQ route.

Send the drawing and required temper

Send the controlled drawing, alloy, delivery condition, annual volume and required acceptance records. Submit the RFQ details, then email your drawing for a structured quote review. Send the drawing, target alloy, finishing scope, MOQ, and delivery timing. Bohua will review it like a real sourcing project, not a generic contact request. Our engineering team can recommend the right alloy, process, and design optimizations for your specific requirements.

Send your drawing →