Quick contact channel open - reply within 24 hours

Contact Bohua Casting

Use this page for quick questions, direct email, WhatsApp, or pre-RFQ communication.

If you already have drawings, annual volume, alloy, or machining requirements ready, go to our formal RFQ page so the engineering team can review your project faster.

Best next step for serious buyers

Already have drawings and sourcing requirements?

Use the dedicated RFQ page for drawing-based quotations, DFM review, leak-test requirements, annual volume, and machining scope.

Company: Ningbo Bohua Mechanical Parts Co., Ltd.

Facility: 13,420 sqm

Team: 85

Capacity: 2,500 tons

Certification: IATF 16949

Location: Fenghua, Ningbo, Zhejiang, China

We reply within 24h

Leave Your Details

Send a real RFQ here, or email linda@ningbobohua.com directly for urgent projects.

Best results: include drawing/spec, material, quantity/MOQ, tooling status, lead time target, testing/inspection scope, and whether you prefer email or WhatsApp follow-up.

PDF, STEP, IGES, DWG, or ZIP up to 20MB.

Best RFQ Checklist

Include these for a faster, more accurate quote:

012D drawing + 3D model (PDF + STEP ideal)
02Target alloy or application requirement
03Annual volume and first order quantity
04Machining, thread, and sealing-face scope
05Inspection: X-ray, leak test, PPAP, or CMM
06Target timeline, packaging, and delivery terms

Contact FAQ

What should buyers send for an aluminum casting quote?

The best RFQ includes drawing files, target alloy, annual volume, machining scope, inspection requirements, and any leak-test or packaging expectations. PDF plus STEP is ideal.

Can Bohua sign an NDA before quotation?

Yes. NDA support is available on request before technical review or quotation.

Does Bohua provide DFM feedback before tooling?

Yes. RFQs can include process recommendation, alloy suggestion, and manufacturability feedback before tooling release.

How fast does Bohua reply to RFQs?

Initial response is typically within 24 hours, with detailed quotation and DFM follow-up depending on drawing completeness and project complexity.