Ningbo Bohua Mechanical Parts Co., Ltd. · Linda, Export Sales · linda@ningbobohua.com · www.bohua-casting.com
Application
Aluminum Pump Housing Manufacturer
Bohua reviews custom aluminum pump housing drawings, including A356 pump housings, for casting, heat treatment, CNC machining, dimensional inspection, and pressure-tightness testing. Send the housing geometry, fluid boundary, machined interfaces, annual volume, and buyer specifications so we can review the manufacturing route and acceptance plan for your part. Bohua's quality management system is certified to IATF 16949:2016 by NQA.

Can Bohua Manufacture Your Pump Housing?
Bohua can review a custom aluminum pump housing as a casting-only, heat-treated, or cast-and-machined project. Suitability depends on the drawing, pressure boundary, internal passages, wall transitions, sealing features, machining stock, inspection plan, and annual volume. Include those requirements in your drawing package so we can review the complete manufacturing scope with you.
- Casting experience
- Since 1994
- Tilt-pour machines
- 32
- Vertical gravity machines
- 10
- Site area
- About 16,300 m²
- Immersion test range
- 3 bar or more
At Bohua
Gravity casting and tilt-pour are the principal processes. The plant has 32 tilt-pour machines, some designed and built in-house, plus 10 vertical gravity casting machines and 10 hot-box core shooters. A356 and ZL114 are the confirmed alloys for Bohua's gravity and tilt-pour work.
See Bohua's aluminum gravity casting capability for the equipment range, or use the casting process selection guide when the route is not fixed.

A356 Aluminum Pump Housings
A356 is a candidate for aluminum pump housings when castability, heat-treatable strength and corrosion resistance are needed. The AFS Casting Source alloy overview describes these properties for the 356 family and explains the mechanical-property benefit of the lower impurity levels in A356. These are material-selection reasons; the alloy name alone does not establish pressure-tightness or compatibility with a particular pumped fluid.
At Bohua
For Bohua's A356 pump-housing work, each melt is released for pouring only after both vacuum hydrogen testing and spectrometric composition analysis pass.
X-ray acceptance uses GB/T 11346-2018 grading, with the acceptance grade specified by the customer.
The tooling and sealing sections below give the first-article timing, immersion-test conditions and customer-approved outsourced impregnation boundary. The pump volute case study linked below provides an application example.
Review the Features That Define Your Pump Housing
Use the pump housing engineering and inspection guide to prepare the feature-specific inputs for a manufacturing review.
For a large pump volute that failed CT inspection at other foundries, see how melt control and die revisions led to approved castings in our pump volute case study.
- Hydraulic and rotating interfaces: supply approved volute geometry, wear-ring mating data, and functional-bore relationships.
- Vacuum housings: identify the assembled vacuum boundary, blind-hole condition, and final bore or groove state. A product example does not prove vacuum performance for a new design.
- Fire-pump housings: name the applicable assembly specification and edition. Assign complete-pump approval and component inspection to their respective owners.
Define the Housing Before Selecting the Route
Send the housing drawing so we can review the casting route for its geometry. The drawing review should identify the fluid path, enclosed cavities, section changes, core access, machining exposure, and final acceptance state before tooling is quoted.
| Decision | Buyer input | Review outcome |
|---|---|---|
| Delivery condition | As-cast, heat-treated, rough-machined, or finish-machined | Included operations and the point of final acceptance |
| Pressure boundary | Marked cavity map, service medium, and sealing interfaces | Zones requiring tooling, machining, and test attention |
| Material | Alloy, temper, governing specification, and required evidence | Material and heat-treatment scope for the quotation |
| Volume | Annual volume and release pattern | Process, tooling, and production assumptions |
Bohua quotes by annual volume, and small batches are negotiable. Send the controlled drawing and project acceptance criteria so we can review the required housing specification and delivery scope.
Tooling and CNC Machining for Functional Interfaces
Tooling, machining datums, and inspection datums should be planned together. Pump housing quotes can otherwise cover different scopes even when every supplier receives the same outside geometry.
At Bohua
Bohua designs and makes molds in-house with UG and SolidWorks and uses AnyCasting for casting simulation. Most molds use GB 45 carbon steel; H13 is used for higher requirements. A356 permanent molds typically last about 20,000–50,000 shots. That range applies to GB 45 carbon-steel molds; H13 molds last about 100,000 shots with regular maintenance. First article takes 5–6 weeks from drawing confirmation.
Machining equipment includes 16 vertical machining centers, 2 CNC engraving and milling machines, 22 CNC lathes, and 2 large lathes. The mold workshop has 17 machines. T5 and T6 heat treatment are performed in-house.
Mark gasket faces, O-ring grooves, bearing or seal bores, ports, threads, mounting faces, and datum features on the controlled drawing. State the required final condition and the process stage at which each dimension is accepted. Bohua's confirmed general capability is CT8 in the as-cast condition and ±0.02 mm for critical machined dimensions. Mark the features requiring these tolerances so we can review feasibility against your drawing.
For a closer look at the finished-part scope, review Bohua's casting and CNC machining capability and the drawing requirements for casting RFQs.

Sealing Interfaces and Pressure-Tightness Scope
Define the test boundary and the acceptance rule before comparing quotations. Include the test pressure, duration, visible-bubble rule, sampling plan, record format, and part condition during testing so we can review the full leak-test scope.
- Boundary: mark every cavity, cover face, gasket land, O-ring groove, threaded port, plug interface, and machined surface that closes the test volume.
- Stage: state whether acceptance applies to the casting, the machined housing, the coated part, or the final assembly.
- Conditions: give the pressure with units, test duration, acceptance criterion, sampling plan, and required records.
- Responsibility: separate component testing from pump assembly, performance, and regulatory validation.
Bohua test boundary
Bohua's pressure-tightness test method is air-under-water immersion at 3 bar or more. The buyer's project specification must define the pressure, duration, acceptance criterion, test stage, sampling, and records. Impregnation is performed by a qualified subcontractor only with customer approval.
Use the pump casing pressure-tight RFQ guide to prepare these fields. The broader leak-tight aluminum casting page explains how casting, machining, and test scope are separated.
Inspection Evidence to Agree in the RFQ
Request only the records needed for the drawing risks, and state their frequency and format before tooling release. List the methods and reports you need so we can confirm which checks and records the quotation includes.
| Checkpoint | Bohua capability | Buyer must define |
|---|---|---|
| Material identity | Oxford optical emission spectrometer | Alloy, temper, governing specification, and certificate format |
| Internal inspection | Unicomp UNC-160 and Y.MU2000-D X-ray systems | Critical zones, frequency, acceptance reference, and record format |
| Dimensions | Hexagon Global S and NANO Metrology CMM systems | Datums, critical characteristics, sampling, and report layout |
| Submission package | PPAP support up to Level 5 | Submission level, deliverables, timing, and approval authority |
Bohua's quality management system is certified to IATF 16949:2016 by NQA, with the certificate valid through November 20, 2027. Review the full inspection and quality-control capability before specifying the project record pack.

Pump, Valve, and Flow-Body Casting Examples
These photographs show aluminum parts Bohua has made. Use the part families and visible geometry to discuss your design. Send the required alloy, process, dimensions, pressure rating, tolerance, and test acceptance criteria for your drawing review. Customer logos and part numbers are masked.
What to Send for a Pump Housing Review
A useful inquiry defines the component boundary, finished interfaces, test criteria, records, and commercial volume in one controlled package.
- Drawing set. Send a revision-controlled 2D drawing and a STEP model when available.
- Functional map. Mark fluid cavities, sealing interfaces, machined exposure zones, bearing or seal bores, ports, and mounting datums.
- Supply condition. State alloy and temper requirements and whether delivery is as-cast, heat-treated, machined, coated, cleaned, or ready for assembly.
- Acceptance plan. Define dimensional checks, pressure-tightness criteria, inspection stage, sampling, traceability, and required reports.
- Project quantities. Give sample needs, annual volume, release pattern, tooling status, destination, and packaging requirements.
When the files are ready, submit the pump housing RFQ. If the drawing package is still being organized, use the aluminum casting RFQ checklist.
Pump Housing Manufacturing Questions
Review the component scope against the controlled drawing and the agreed acceptance plan.
Does Bohua supply raw or machined pump housings?
The reviewed scope may include casting, in-house T5 or T6 heat treatment, and CNC machining. The drawing and quotation must state the delivery condition, final acceptance state, finishing, cleaning, inspection, packaging, and any buyer-owned operations.
Which documents define the pump housing material and pressure rating?
Use the controlled drawing and project specifications to define alloy, temper, manufacturing route, dimensions, pressure rating, and tolerance. Include the required inspection records so we can review how each requirement will be checked and documented.
Can Bohua perform pressure-tightness testing?
Yes, within the confirmed air-under-water immersion capability of 3 bar or more. The buyer still defines the project pressure, duration, acceptance criterion, test stage, sampling, fixture boundary, and record format.
Does the component quote include complete-pump approval?
The quotation covers the agreed component scope. Define pump assembly, performance, service, and regulatory validation separately. If the component supplier has an obligation in those areas, assign it explicitly in the controlled project documents for review.
Send your pump housing drawing for a sealing and machining review
Share the tested boundary, sealing faces, machining scope and annual volume. Not sure which process fits? Tell us what the part must do. In a free drawing review, our engineers recommend a process and suggest design changes where needed.
Send your drawing →




