Buyer Resource
Aluminum Casting RFQ Checklist for Buyer Packages
What should I send before asking for an aluminum casting quote? This checklist covers drawing files, 3D models, alloy notes, machining scope, inspection requirements, quantity range, and sourcing context so a supplier can review the same assumptions before pricing.
RFQ routing
Start from the buyer's sourcing decision
A useful checklist does more than collect files. It routes the project into the right review path so quote assumptions are comparable before tooling, CNC machining, inspection records, freight, or supplier approval work begins.
A356 pump housing or fluid-path housing
Use this route when leak-test criteria, pressure, machined sealing faces, bearing seats, or A356-T6 heat treatment drive the quote.
Open pump housing RFQ route →Valve body, manifold, ports, or threaded hydraulic part
Use this route when CNC ports, threads, bores, sealing faces, pressure or leak-test records, and CMM or gauge requirements affect quote scope.
Open valve body RFQ route →Supplier comparison or second-source project
Use this route when you are comparing Bohua with another supplier, replacing an incumbent, qualifying a backup source, or reviewing tooling ownership.
Open supplier comparison route →Regional cost or landed-cost benchmark
Use this route when China, USA, and Europe quotes must be compared by tooling, machining, inspection, freight, duties, Incoterm, and broker review.
Start regional cost RFQ →Quote package
The four fields that make a casting quote comparable
Drawing package
- - 2D PDF drawing with revision level and date
- - 3D STEP or IGES model if available
- - Critical dimensions, GD&T, datums, sealing faces, bores, ports, and threads
Part and process context
- - Part family and application: pump housing, valve body, gearbox, EV motor housing, bracket, or enclosure
- - Alloy target such as A356, ZL114, ADC12, buyer-approved equivalent, or open material review
- - Process preference or open-process note: gravity casting, die casting, low-pressure casting, or supplier review
Commercial comparison fields
- - Annual volume, sample quantity, launch timing, and batch size
- - Raw casting, heat-treated casting, fully machined part, coated part, or assembled component
- - Destination, Incoterm, freight mode, packaging, and landed-cost comparison needs
Inspection and approval records
- - Material certificate, heat-treatment record, CMM report, FAI, PPAP, or traceability format
- - Leak-test medium, pressure, hold time, and acceptance criteria if pressure or sealing matters
- - Surface finish, coating, cleanliness, burr-control, gauge, or buyer-specific approval requirements
Drawing Package
Drawing files and revision notes
The most useful RFQ package starts with a 2D drawing and a 3D model. PDF format works well for 2D drawings. STEP or IGES files are preferred for 3D geometry. If only a 2D drawing is available, that is still a workable starting point for a process discussion.
Include the drawing revision number and date. If the drawing is marked preliminary or for-review, note it clearly. Suppliers need to know whether the geometry and tolerances are locked or still subject to change before tooling decisions are made.
Highlight any critical dimensions, GD&T callouts, sealing surfaces, datum scheme, and thread or port features. These directly affect tooling design, secondary operations setup, and quality review planning. The more clearly these are marked on the drawing, the less back-and-forth is needed before quoting.
Part Context
Part function and operating context
A brief description of what the part does and where it fits in the assembly helps the supplier ask better questions and flag risks early. A housing that carries fluid under operating load has different review priorities than a structural bracket or enclosure casting.
If the part replaces an existing design from another supplier, note whether the interface dimensions are fixed or whether the new supplier has design freedom. Second-source and replacement projects often benefit from sharing a sample or reference casting alongside the drawing package.
Volume and Project Stage
Target quantity range and project stage
Annual volume and project stage are two of the most useful pieces of context in an RFQ. They affect process route selection, tooling type, and pricing structure. A range is enough — an exact forecast is not required.
- →Prototype or first-article: state that tooling budget is part of the discussion and early samples are the priority.
- →Annual production: include a low/mid/high range (e.g., 500–2,000 pieces per year) so the supplier can select a tooling and cycle approach that fits the volume.
- →Launch-stage or ramp program: describe the timeline and whether supplier qualification or first-article approval is required before production release.
Material Notes
Material preference or open material review
If the alloy is fixed by engineering requirement, state it in the RFQ message. If the alloy is open for discussion, describe the mechanical requirements instead — tensile strength range, elongation requirement, or hardness target — so the supplier can suggest a suitable option with process context.
Heat treatment requirement should also be noted. T5 and T6 heat treatment changes the mechanical outcome and affects cycle time. If heat treatment is required for the application, include it in the RFQ scope even if the exact specification is not yet finalized.
Surface and Assembly
Surface, assembly, and packaging notes
Surface finish requirements, coating or treatment scope, and packaging needs are often left out of the first RFQ message and added later. Including them upfront avoids a secondary quote round after tooling discussions have started.
For export shipments, note whether the parts need individual part protection, bulk packing, or export crating. Incoterm preference (FOB Ningbo, CIF destination, or other) can also be noted at this stage so freight and documentation assumptions are visible from the start.
Optional but Helpful
Existing part photos or samples when available
Photos of existing parts, competitor samples, or reference castings are useful when the drawing does not fully communicate the surface quality expectation or geometry intent. If you have a sample that represents the acceptable standard, note that in the RFQ message and include photos if possible.
Contact and Response
Contact information and preferred response path
Include a direct contact name and email for the person handling the sourcing decision. Specify whether you want a quote response, a process recommendation, a DFM review, or a combination. Setting this expectation at the start reduces the number of clarification rounds before the supplier can deliver a useful response.
Upload drawings for RFQ review
Ready to send your drawing package? Upload drawings, models, and sourcing context for a Bohua RFQ review.
FAQ
Buyer questions about aluminum casting RFQ preparation
What files should I send with an aluminum casting RFQ?
Send 2D drawings (PDF) and 3D models (STEP preferred) along with your alloy preference or mechanical requirement, annual volume estimate, machining scope, inspection requirements, secondary operation notes, and surface finish notes. A complete drawing package allows the supplier to review geometry, process fit, tooling approach, and quote assumptions before pricing.
Can I request a review before the drawing is final?
Yes. Early-stage drawings or concept sketches can still support a process discussion. Mark the drawing as preliminary and note which dimensions or features are still under review. Suppliers can give useful feedback on wall sections, draft, and alloy choice even before the drawing is locked.
What if I am unsure which casting process fits the part?
Include part weight, envelope size, wall section range, mechanical requirements, and target volume. The supplier can suggest a process option and explain the fit. See the casting process selection guide for a discussion of common casting approaches.
Should I include quantity range and project stage?
Yes. Annual volume and project stage (prototype, pilot, or production) affect tooling type, process route, and pricing structure. A quantity range is enough — an exact forecast is not required at the RFQ stage.
Can photos or existing samples help the review?
Photos and sample castings are useful when drawings are incomplete or when replacing an existing part from another supplier. They help the supplier understand geometry intent, surface finish expectations, and any features that are difficult to communicate in 2D.
How should I route the RFQ if the part is a pump housing or valve body?
Use a part-family route when the RFQ has pressure, sealing, port, thread, bearing-seat, leak-test, or CMM record requirements. A pump housing or valve body RFQ should not be treated as a generic casting request because the machining and inspection assumptions can change the quote.
Should landed cost, Incoterm, and tariff assumptions be included in the first RFQ?
Yes. If the project is being compared across China, the USA, or Europe, include destination, preferred Incoterm, freight mode, packaging, and any customs-classification questions your importer or broker needs to verify. The supplier can state quote assumptions while the buyer validates official duty treatment.