# Aluminum Casting Lead Time: How to Get 7-Day Rush Delivery from China
When buyers search aluminum casting lead time, they want to know: How long does it normally take, and can you go faster if needed? The answer depends on what stage you're in and which manufacturer you work with.
Standard Lead Times
- •Tooling (new projects): RFQ-dependent timing
- •Samples: 7-15 days
- •Production (repeat orders): production timing confirmed after RFQ review
RFQ CTA
Have a casting project? Upload your drawing for a fast, structured quote review.
Send the drawing, target alloy, finishing scope, MOQ, and delivery timing. Bohua will review it like a real sourcing project, not a generic contact request.
How to Accelerate
- •Use air freight (5-10 days) instead of sea (25-40 days)
- •Work with suppliers offering in-house mold shops
- •DDP delivery eliminates customs delays
For rush orders with existing tooling, 7-day delivery is achievable with air freight and priority production.
Need fast delivery? Start RFQ with Bohua to discuss your timeline requirements.
Project CTA
Need MOQ, Tooling, or Cost Reviewed?
Send your drawing for a structured DFM review, quote scope, and project-specific timing discussion.